Our DOMINO consortium has a brand new website 

The Dispersion of Nanoparticles in Liquids Consortium (DOMINO) is one of the three industrially steered research consortia that we are run at BHR Group. Its purpose is the development of industrially relevant research, and best guideline practises, for the dispersion of nanoparticles and the delamination of nanoclays in liquids.

Please visit the
new website of the DOMINO Consortium where you can find out more about the research, the current members and how you could benefit from membership.
 

Kind regards,

The DOMINO Management
www.domino.bhrgroup.com  














www.bhrgroup.com

Gas-to-Liquid using Process Intensification

BHR Group with support from the OGID of the DTI has carried out a feasibility study to assess the technical and commercial viability of novel Process Intensification (PI) concepts for Gas-to-Liquid (GTL) conversion for the production of hydrocarbons.  In particular to carry out the significant process steps for:

  • Steam Reforming (SR) which produces syngas
  • Fischer-Tropsch (FT) synthesis of syngas into hydrocarbon and oxygenated species.

 

Project Goals

The work reviewed the three main steps involved in GTL conversion namely: Syngas Production, Syngas Conversion and Product Upgrade covering both conventional GTL processes and novel processes (including PI).  The technical and economic viability of the reactor concept has also been evaluated based on an assessment of The key technical variables that determine GTL productivity.  This included determining catalyst conversion and selectivity, in particular for surface coated catalysts which would be used in a HEX reactor over a typical range of operating conditions.

 

Applications

The application of PI techniques for these key process steps could result in a significant difference between a conventional GTL and PI-based GTL Plant as the PI solution removes the need for oxygen storage in the Syngas Production stage and conventional process equipment in the production, conversion and possibly upgrade stages.  This would eliminate major large scale equipment and storage facilities which are at a premium in offshore installations.

SEARCH OUR SITE


Fluid Systems Enquiries

enqfluidsystems@
bhrgroup.co.uk

 

Commercial Manager

+44 (0)7850 377 041

 

Login